BIRD HIDE
Built: 2018
Location: Dartington, Totness, UK

Rendered Proposition
Completed
Bird Hide after Rainy season
BIRD HIDE COMPLETED
The following images compare the rendered proposition to the completed project


Prefabrication of the Fins

Shaving the timber stalks to be used for the foundation

Assembly of the Frame

Frame Complete
Measuring the OSB board to the frame

Attaching the OSB to the frame

Applying Primmer before the black paint

Attaching the batons to the walls
CONSTRUCTION
The following images were of the construction process which entailed huge collaborative efforts and accuracy during the prefabrication phase.

Decking Plan

Roof Plan

Detailed explanation

Fins section

Drawing of Prefabricated walls

Site drawing

Site Drawings
DRAWINGS
The following drawings were the blu prints used on site to construct the elements that were prefabricated.