BIRD HIDE
Built: 2018
Location: Dartington, Totness, UK
Rendered Proposition
Rendered Proposition
Completed
Completed
Bird Hide after Rainy season
Bird Hide after Rainy season
BIRD HIDE COMPLETED
The following images compare the rendered proposition to the completed project
Prefabrication of the Fins
Prefabrication of the Fins
Shaving the timber stalks to be used for the foundation
Shaving the timber stalks to be used for the foundation
Assembly of the Frame
Assembly of the Frame
Frame Complete
Frame Complete
Measuring the OSB board to the frame
Measuring the OSB board to the frame
Attaching the OSB to the frame
Attaching the OSB to the frame
Applying Primmer before the black paint
Applying Primmer before the black paint
Attaching the batons to the walls
Attaching the batons to the walls
CONSTRUCTION
The following images were of the construction process which entailed huge collaborative efforts and accuracy during the prefabrication phase. 
Decking Plan
Decking Plan
Roof Plan
Roof Plan
Detailed explanation
Detailed explanation
Fins section
Fins section
Drawing of Prefabricated walls
Drawing of Prefabricated walls
Site drawing
Site drawing
Site Drawings
Site Drawings
DRAWINGS
The following drawings were the blu prints used on site to construct the elements that were prefabricated. 
Back to Top